防火电缆桥架的安装程序

1.测量定位,安装桥架的支架,经检查确认,才能安装桥架;

1. The measuring position, install the framework of the bridge, confirmed by the inspection, can install bridge;

2.桥架安装检查合格,才能敷设电缆;山东电缆桥架

2. Bridge installation inspection, to laying cable;

3.电缆敷设前绝缘测试合格,才能敷设;

3. The cable laying before the insulation test qualified to laying;

4.电缆电气交接试验合格,且对接线去向、相位和防火隔堵措施等检查确认,才能通电。

4. Cable electrical commissioning test qualified, and the direction of wiring, phase and fire bulkhead measures such as check, to electricity.